City of Karratha

City of Karratha Complete Waste Shredding Performance Trials

The City of Karratha provides residential and commercial waste disposal services at the 7 Mile Waste Facility. The facility is located approximately 10km west-southwest of Karratha and owned and operated by the City. With a small population of just 16,000 and many heavy industries close by; the landfill at 7 Mile Waste Facility receives a unique waste stream. Unlike many other landfills, 50% of Karratha’s waste receivables is bulky commercial and industrial waste with an above average bulk density of 215kg/m³. The average landfill waste stream is predominantly made up of domestic household waste due to the large population cluster that tends to serve the landfill. These landfills have an average commercial waste density reported to be of a much lower density of just 161-185kg/m³. The unique waste profile received by 7 Mile waste facility has led to a number of challenges including a reduction on the landfill lifespan as originally projected as well as an unacceptable cost for running and maintaining the city’s fleet of landfill compactors. Original lifespan projections were based on a much higher material density that what is actually being achieved. Original projections did not take into account the bulky, abrasive characteristics of the waste actually received by the facility. With the lack of relevant data from other sources, the City took the step to undertake an intensive study in collaboration with FOCUS enviro with the aim of building a better profile of their waste stream and to gain a greater knowledge of the potential costs and benefits associated by introducing a waste shredding line into the treatment process.

TRIAL METHODOLOGY

An exclusion zone was set up to isolate the shredding trial from the daily operations at the tip thus providing a controlled environment for accurate data collection and prevent possible cross contamination. An EDGE Slayer XL slow speed shredder was feed with various waste types that had historically proven to be troublesome for the landfills compactors. These were identified as being C&I waste, tyres, HDPE, air filters, mattresses and metal. Over a three-week period the Slayer XL processed these troublesome waste types individually until each stockpile was completed. To measure the volume reduction and work out the increase in the bulk density of each of the materials processed; the stockpiles were surveyed before and after the shredding process. The data was then extrapolated to give bulk density readings based on the tonnage measured and the original volume or materials stockpile. This process was repeated once the material was shredded to provide comparable data.

RESULTS

The results in all cases as expected showed a reduction in volume and large density increases. However it was the extent of the volume reduction that was of most significance. The overall total volume of all materials processed was reduced from 856m³ (Pre-shred) to 333m³ (Post-shred) prior to compaction. The overall average percentage reduction of materials by 61% would highlight and recommend the use of slow speed shredding in this application where saving landfill space for the future, maximising cell capacity and reducing the reliance on landfill compactor operation/costs are the goals. In the caseof 7 Mile Waste Facility it is projected that the lifespan of the landfill would be extending from 2038-2054 (16 years) which itself, is a capital saving of approximately $7.8 million. The largest net earner from the process was the recovery of hidden ferrous metal from the general waste stream that traditionally have been lost. The EDGE Slayer XL was able to recover between 5-8T/day. The equivalent of $18,000 per month. Another notable post shredding benefit included the ease of handling and future compaction, reduction in litter and reduction in rodent/bird interaction of the shredded material with a reduction in material cover required.

Morné Hattingh, Managing City Services – City of Karratha; “Choosing to upgrade an existing plant or designing a new facility to include shredding must be evaluated on a case by case basis to determine if the benefits are worth the additional capital investment and operating costs. Purchasing cost and Operational cost of a waste shredder may seem like a large increase but it should be kept in mind that by far the majority of the cost of operating a landfill facility is dedicated to paying back initial capital investment, which in our case, increase by less than 2% with the addition of shredding equipment”. The next step in this process is to look at the what has not been measured and which will become the biggest peripheral benefit in the process of shredding at landfill is the savings realised from the reduced reliance on the landfill compactors.”

Weight – T Volume-  m³ Density – kg/m³
Waste Material Processed Pre-Shred Post Shred % Reduction Pre-Shred Post Shred % Increase
C&D Waste 115.52 524 189 63.93 220.46 611.21 277.24
Tyres 19.78 122 42 65.57 162.13 470.95 290.48
HDPE 11.29 87 46 47.13 129.77 245.43 189.13
Air Filters 3.14 38 11 71.05 82.63 285.45 345.46
Mattresses 1.24 24 4 83.33 51.66 310 600.08
Metal 26.42 61 41 32.79 433.11 644.39 148.78

 

Mattresses Put to Bed with EDGE Shredder!

Shredding Mattresses

The EDGE Shredder has provided the ‘best value’ solution for shredding and volume reduction of not only mattresses but also Green Waste, Wood Waste, C&D and C&I. All of which is possible with the touch of button from the machine display panel. An important feature of the EDGE machine is the energy saving fuel management system which matches the engine RPM to the fuel consumption. Saving money, reducing emissions and still providing the ‘lowest cost per tonne’ solution now synonymous with the EDGE equipment range. Upon its arrival, the shredder was put straight to work and processed a backlog of over 500 mattresses in the first two days of operating!

The unit supplied to Bunbury-Harvey Regional Council was fitted with EDGE Innovate’s universal chamber which has enable the council to reduce the volume of the mattresses by a massive 83.3%.  A height adjustable magnet fitted to the shredder unit as standard, has also allowed the council to recover a large volume of ferrous metal contained within the mattresses. The big advantage the EDGE Slayer XL has over a single shaft waste shredder is the up time. Thanks to the twin shaft design of the EDGE Slayer XL, the traditional wrapping often found when shredding mattresses is prevented due to the self-cleaning characteristics inherited from the two shaft design utilised in EDGE’a shredder range. This results in less daily maintenance, more produciton and a much safer operation.

“We are honoured to have been selected by Bunbury-Harvey Regional Council. We also look forward to supporting them and helping them to deal with more materials, more efficiently and be a part of their successful campaign on setting new standards in recycling here in West Australia” said Robbie McKernan, director at Focus Enviro.

EDGE Innovate provide world class solutions to the waste processing and recycling industries including shredders, trommel screens, density separators, picking stations and flip-flow screens. This project is one of many examples which demonstrates the productivity and flexibility of the EDGE product portfolio. To find out more on how we can help with your waste recycling operation email info@edgeinnovate.com.